HISTORIC ARCHITECTURAL REVIEW BOARD (HARB) AGENDA
Wednesday – July 15, 2026, at 7:00 PM in Troxel Council Chambers
1. Call meeting to order 7:00 PM.
2. Review and Approval of Agenda & Meeting Minutes
A. A motion to approve the Business Meeting Agenda of July 15, 2026
B. A motion to approve the Meeting Minutes of June 30, 2026
3. Public Comment
4. Consent Agenda Motion to Approve:
A. COA 26-00300 CRITICAL PROJECT – 252 Baltimore Street – John Buchheister
Installation of new roof material from 3-tab asphalt shingle to architectural shingle
material (Tanko Titan).
B. COA 26-00313 CRITICAL PROJECT – 252 1/2 Baltimore Street – John Buchheister
Installation of new roof material from 3-tab asphalt shingle to architectural shingle
material (Tanko Titan).
C. COA 26-00330 CRITICAL PROJECT – 40 W. High Street – Philip Fazenbaker
Demolition of unsafe rear accessory structure/garage resulting from a vehicle
collision.
D. COA 26-00335 MAJOR PROJECT – 631 S. Washington Street – John Merrell
Installation of new black aluminum railings (Freedom Margate). New concrete
steps. New 4″x4″ porch.
5. Old Business: N/A
6. New Business:
A. COA 26-00220 CRITICAL PROJECT – 619 Baltimore Street – Joseph Warner
Demolition of rear gazebo/accessory structure.
B. COA 26-00316 CRITICAL PROJECT – 114 Buford Avenue – Chris Garliss
Remove existing vinyl siding and replace with 8-1/4-inch, 7-inch reveal HardiPlank
siding.
C. COA 26-00318 MAJOR PROJECT – 200 York Street – Troy Nunemaker
Construction of a 392 square foot (14’x28’) T1-11 wood siding, accessory structure
to the rear of the existing principal structure.
D. COA 26-00324 MAJOR PROJECT – 150 Carlisle Street – Muhammad Ashraf
Construction of a 600 square foot (20’x30’) 8-foot-tall metal accessory structure to
the rear of the existing principal structure.
E. COA 26-00346 CRITICAL PROJECT – 111 N. Stratton Street – Tim Harrison
Construction of a 16’ x 32’ bus transit center with a total coverage area expanded
with a 16’x80’ canopy roof. Associated with Gettysburg Station Subdivision and
Land Development Plan.
F. Chapter 11 Historic District Ordinance Recommendation.
7. Reports
A. Administrative COA Approvals from the last meeting – Ordinance 11-108 Duties
and Responsibilities [Ord.1118-91, 8/12/1991, & 108]
Certificates of Appropriateness approved administratively since the last HARB
meeting:
1. COA 26-00332 Minor Project – 631 S. Washington Street
Installation of new decking tongue and groove, install new lattice, install new
2×8 floor joists.
B. Report of Chair
C. Report of Staff
8. Public Comment
9. Adjournment
NOTE: HARB is a DESIGN review board only, each project must meet all other
Borough Ordinance and Building Code Requirements prior to final approval
through Borough Council on the 2nd Monday of the following month.