Friday, February 20, 2026
No menu items!

Gettysburg Architectural Review Board – 02/18/2026

HISTORIC ARCHITECTURAL REVIEW BOARD (HARB) AGENDA
Wednesday – February 18, 2026 at 7PM in Troxel Council Chambers

1. Call meeting to order 7PM.

2. Review and Approval of Agenda & Meeting Minutes
A. A motion to approve the Business Meeting Agenda of February 18, 2026
B. A motion to approve the Meeting Minutes of January 21, 2026

3. Public Comment

4. Consent Agenda Motion to Approve:
a. COA – 26-0024 128 York Street – Michael Cannon – Move Gas meter to outside of
building.

5. Old Business: N/A

6. New Business: Applications for Initial Review:

A. COA 26-0026 MAJOR PROJECT – 17 Mummasburg Street – Harry Stokes
Repoint stone foundation in the basement, restore wood siding under stucco if in good condition.

B. COA 26-00XX MAJOR PROJECT – 110 Chambersburg Street – Jake Schindel
Construct brick archway on east front of property, repair existing sidewalk with brick.

C. COA 26-0006 MAJOR PROJECT – 132 E. Middle Street – Philip Goble
Replacement of 13 windows with ‘in-kind’ with no changes to the rough openings. West side Bay and little window both vinyl, 2 wood windows on the east side, 2 on the north side/rear are wood.
None of the windows are located on the front façade, all are on the side and rear of the structure not visible from the main streetway.

D. COA 26-0029 MAJOR PROJECT – 34 W. Middle Street – Rich Finkenbiner
Change exterior door and hardware on rear 3rd floor, replace with Alder wood door. Replace
three (3) windows, two (2) double hung front façade 3rd floor and one 3rd floor west side
window with horizontal sliding window. All windows to be replaced are currently vinyl in style. New windows will match existing windows grid pa

E. COA 26-0021 MAJOR PROJECT – 29 E. Middle Street – Darren Glass
Reconstruction of a 12’x21’ garage with same footprint. Designing the new garage will mimic a 1920s style, and pick up additional design elements from the existing home. Concrete block foundation, framed with 2×6’s and sheathed to receive LP Smooth Smart side. Three (3) awning type windows will be installed on the alley side (south) elevation with a 10’Wx7H’ on the front side (west) elevation, and one double hung door and one window on the left side (north) elevation. Roof will be shingles to match the house.

7. REPORTS
A. Administrative COA Approvals from the last meeting (see list attached) Ordinance 11-108 Duties and Responsibilities [Ord.1118-91, 8/12/1991,& 108]
B. Report of Chair
C. Report of Staff – REMINDER to complete your yearly 2 hours of training due December 31, 2025. 2026 Awards will be in May of next year!

Certificates of Appropriateness approved administratively since the last HARB meeting:
N/A

8. Public Comment

9. Adjournment 

RELATED ARTICLES

LEAVE A REPLY

Please enter your comment!
Please enter your name here